The Urban Developer
AdvertiseEventsWebinars
Urbanity
Awards
Sign In
Membership
Latest
Menu
Location
Sector
Category
Content
Type
Newsletters
Untitled design (8)
FULL PROGRAM RELEASED FOR URBANITY-25 CONNECTING PROPERTY LEADERS ACROSS THE ASIA PACIFIC
FULL PROGRAM RELEASED FOR URBANITY-25 WHERE THE PROPERTY INDUSTRY CONNECTS
VIEW FULL AGENDADETAILS
TheUrbanDeveloper
Follow
About
About Us
Membership
Awards
Events
Webinars
Listings
Resources
Terms & Conditions
Commenting Policy
Privacy Policy
Republishing Guidelines
Editorial Charter
Complaints Handling Policy
Contact
General Enquiries
Advertise
Contribution Enquiry
Project Submission
Membership Enquiry
Newsletter
Stay up to date and with the latest news, projects, deals and features.
Subscribe
ADVERTISEMENT
SHARE
1
print
Print
OtherMarisa WikramanayakeThu 02 Feb 23

Adelaide School’s $98m Vertical Expansion Design Revealed

Cox Architecture's conceptual design for the second stage of the Adelaide Botanic High School.

The design for the $98-million next stage for a popular Adelaide high school has been revealed with space for the predicted 700 extra students to go up, not out.

The Adelaide Botanic High School expansion project was prompted by the tipped increase in student numbers, which will bring the cohort to 1950 across years 7 to 12.

The high school on Frome Road is surrounded on three sides by the city’s botanic gardens and is of the doorstep of Adelaide’s CBD.

Under the concept plan and framework by Cox Architecture, a vertical building will integrate with the existing communal spaces.

As the building is vertical, tit does not have traditional corridors, while building services will be exposed across ceilings to showcase operational engineering so students can seehow a building is constructed, according to the architects. 

There will also be new contemporary learning areas with food technology, music and an entrepreneurial hub, and the school’s second cafe with indoor and outdoor eating areas.

The rooftop will have the school’s second sports facility including an enclosed basketball half-court and a multi-purpose half-court.

This stage of the project is scheduled for completion in 2024.

The first stage created a new built form and central atrium to integrate with the original 1960s Reid Building.

Cox Architecture has designed the concept for the second stage of the Adelaide Botanic High School project.
▲ A render of the Cox-Architecture-designed concept for the second stage of the Adelaide Botanic High School project.

“We aspire to deliver an environment where students can explore their interests deeply, collaborate with peers and become informed future citizens,” Cox Architecture director Zoe King said.

Outside school hours, existing facilities including the atrium, terrace, gym, recording studios and kitchen spaces are used by the community, universities and government agencies.

Illuminate Adelaide and other events are staged at the school—it is anticipated that the new rooftop areas will also host such events.

Cox Architecture director Adam Hannon said the practice was pleased to “progress the next phase of Adelaide Botanic High School, increasing the opportunity for more students to benefit from the state-of-the-art facilities”. 

As land becomes more scarce, building low-rise horizontal educational buildings is giving way to educational campuses that contain all required components and services within vertical developments.

OtherEducationAustraliaAdelaidePlanningArchitecturePlanningOther
AUTHOR
Marisa Wikramanayake
The Urban Developer
More articles by this author
ADVERTISEMENT
TOP STORIES
Nation's build-to-rent project Charlie Parker in Sydney's Parramatta where more projects are being located and built outside the CBD.
Exclusive

Foreign Capital Still Dominates BtR but Things are Changing

Marisa Wikramanayake
7 Min
Exclusive

Fortis Reveals Plans for Coveted Bowen Terrace Site

Taryn Paris
4 Min
Exclusive

Accor Deputy Delivers Verdict on Brisbane Games Hotel Shortfall

Phil Bartsch
6 Min
Qld Budget 2025-26 Brisbane City
Exclusive

Billions Promised, Now Deliver: Industry’s Qld Budget Verdict

Vanessa Croll
6 Min
Medium Density housing in NSW
Exclusive

NSW Budget ‘Groundbreaking’ $1bn Guarantee to Unlock Housing

Leon Della Bosca
7 Min
View All >
Linic Property Group Saunton Jindalee
Residential

Linic Group Moves 43-Unit Jindalee Scheme Ahead

Leon Della Bosca
Lincoln Place Eagle Point Bowls Club and Clubhouse
Land Lease Communities

Lincoln Place Plots 209-Home Scheme on Gippsland Purchase

Leon Della Bosca
Nation's build-to-rent project Charlie Parker in Sydney's Parramatta where more projects are being located and built outside the CBD.
Exclusive

Foreign Capital Still Dominates BtR but Things are Changing

Marisa Wikramanayake
Smaller private investors and family offices are reshaping the funding landscape, taking on early planning risks for big…
LATEST
Linic Property Group Saunton Jindalee
Residential

Linic Group Moves 43-Unit Jindalee Scheme Ahead

Leon Della Bosca
3 Min
Lincoln Place Eagle Point Bowls Club and Clubhouse
Land Lease Communities

Lincoln Place Plots 209-Home Scheme on Gippsland Purchase

Leon Della Bosca
3 Min
Nation's build-to-rent project Charlie Parker in Sydney's Parramatta where more projects are being located and built outside the CBD.
Exclusive

Foreign Capital Still Dominates BtR but Things are Changing

Marisa Wikramanayake
7 Min
Lindfield SSD Resi EDM
Residential

North Shore $154m Apartment Play Tests Zoning Limits

Vanessa Croll
2 Min
View All >
ADVERTISEMENT
Article originally posted at: https://theurbandeveloper.com/articles/south-australia-adelaide-botanic-high-school-stage-2-vertical-design