The Urban Developer
AdvertiseEventsWebinarsUrbanity
Industry Excellence
Urban Leader
Sign In
Membership
Latest
Menu
Location
Sector
Category
Content
Type
Newsletters
UPCOMING EVENT - INDUSTRIAL AND LOGISTICS SUMMIT 16 OCTOBER, SYDNEY
INDUSTRIAL AND LOGISTICS SUMMIT - TICKETS NOW ON SALE
LEARN MOREDETAILS
TheUrbanDeveloper
Follow
About
About Us
Membership
Awards
Events
Webinars
Listings
Resources
Terms & Conditions
Commenting Policy
Privacy Policy
Republishing Guidelines
Editorial Charter
Complaints Handling Policy
Contact
General Enquiries
Advertise
Contribution Enquiry
Project Submission
Membership Enquiry
Newsletter
Stay up to date and with the latest news, projects, deals and features.
Subscribe
ADVERTISEMENT
SHARE
print
Print
OfficeTaryn ParisFri 22 Sep 23

Parramatta Reveals Long-Awaited Aquatic Centre

Six years after its pool was bulldozed to make way for a stadium, Parramatta has flung the doors open on its architecturally-designed aquatic centre. 

The $88.6-million pool was co-funded by the NSW and local governments after a bun fight over who would foot the bill.   

The aquatic centre was forecast to attract up to a million swimmers each year ahead of its opening this week. 

The circular structure is at Mays Hills in Parramatta Park. 

The Grimshaw Architects-led design team, with Andrew Burges Architects and McGregor Coxall, was charged with creating something that blended into the landscape, despite its 40,000sq m footprint. 

null
▲ The circular design of the aquatic centre was designed to limit its intrusion into the surrounding Parramatta Park.

The Parramatta pool is a modern take on the traditional aquatic centre typology with a focus on outdoor landscaping and recreational space as a place of gathering, according to the architects.

It is the second collaboration between Grimshaw and Andrew Burges Architects, who also delivered the award-winning Gunyama Park Aquatic and Recreation Centre at Sydney’s Green Square. 

Grimshaw Ppoject director Josh Henderson said it was a much-needed piece of infrastructure for western Sydney. 

“The design team, City of Parramatta and builder (Lipman) have all collaborated to create a valuable community asset that is enjoyable to experience, well made, highly functional and accessible,” Henderson said. 

“As a new home to many community groups, the opening of the facility will provide vibrant landscaped public spaces for fitness, sport, learn to swim classes and for time with friends and family.”

null
▲ The aquatic centre is forecast to attract a million visitors each year.

Andrew Burges Architects principal Andrew Burges said the design of the aquatic centre was about sensitively locating the relatively large scale of the development into its park setting with “minimal disruption”.

 “Our goal was to provide a completely new vision of what an Aquatic Centre could be,” Burges said.  

“We wanted to create a destination for the community, one that provides opportunity for many forms of recreation in a safe and inspiring facility that feels more like a landscape setting than a building.”

The Parramatta pool is one of a long list of pool redevelopments that are happening across Sydney. 

The $89-million North Sydney Olympic pool is due to reopen in 2024, as is the Willoughby Leisure Centre, while Canterbury’s aquatic centre rejuvenation is due for completion in 2025. 

The new Parramatta Aquatic Centre comprises a 50m outdoor pool, a 25m indoor pool, a learn-to-swim pool and indoor water playground, a health and wellness centre and gym, in addition to 360 solar panels. 

City of Parramatta Lord Mayor Sameer Pandey said the aquatic centre had been thoughtfully designed for future generations. 

InfrastructureParramattaAustraliaArchitectureConstructionConstructionSector
AUTHOR
Taryn Paris
More articles by this author
ADVERTISEMENT
TOP STORIES
a land lease community home in white at a gemlife development, a type of home which could be the answer to the housing crisis
Residential

‘We are the Solution’: Land Lease Shake-Up Stirs into Life

Renee McKeown
5 Min
Korean coliving hero
Exclusive

Disconnection by Design: Why ‘Untech’ is the Next Big Amenity

Clare Burnett
5 Min
Global Shifts Redraw the Map for Australia’s Office Market
Exclusive

Office Eyes Slowdown as New Stock Supply Becomes a Trickle

Vanessa Croll
7 Min
Salta MD Sam Tarascio
Exclusive

Why Salta Won’t Break Ground on $400m Pipeline

Leon Della Bosca
7 Min
Exclusive

Precinct Proposals Bloom as Brisbane Middle-Ring Sheds its Past

Phil Bartsch
8 Min
View All >
Planning

Bipartisan NSW Planning Reform a Welcome Surprise

Patrick Lau
a land lease community home in white at a gemlife development, a type of home which could be the answer to the housing crisis
Residential

‘We are the Solution’: Land Lease Shake-Up Stirs into Life

Renee McKeown
Legal

Court Freezes Assets as $160m Property Scheme Unravels

Vanessa Croll
From Main Beach apartments to Southport towers, projects are frozen while receivers trace investor funds and builder cla…
LATEST
Planning

Bipartisan NSW Planning Reform a Welcome Surprise

Patrick Lau
5 Min
a land lease community home in white at a gemlife development, a type of home which could be the answer to the housing crisis
Residential

‘We are the Solution’: Land Lease Shake-Up Stirs into Life

Renee McKeown
5 Min
Legal

Court Freezes Assets as $160m Property Scheme Unravels

Vanessa Croll
2 Min
Industrial

Centennial’s Paul Ford: From Vision to Industrial Vanguard

David Di Marco
3 Min
View All >
ADVERTISEMENT
Article originally posted at: https://www.theurbandeveloper.com/articles/parramatta-aquatic-centre-grimshaw-aba