The Urban Developer
AdvertiseEventsWebinars
Urbanity
Awards
Sign In
Membership
Latest
Menu
Location
Sector
Category
Content
Type
Newsletters
Interested in a Corporate TUD+ Membership? Access premium content, site tours, event discounts and networking opportunities
Interested in a Corporate Membership? Access exclusive member benefits today
Enquire NowEnquire
TheUrbanDeveloper
Follow
About
About Us
Membership
Awards
Events
Webinars
Listings
Partner Lab
Resources
Terms & Conditions
Commenting Policy
Privacy Policy
Republishing Guidelines
Editorial Charter
Complaints Handling Policy
Contact
General Enquiries
Advertise
Contribution Enquiry
Project Submission
Membership Enquiry
Newsletter
Stay up to date and with the latest news, projects, deals and features.
Subscribe
ADVERTISEMENT
SHARE
print
Print
EducationStaff WriterTue 12 Sep 17

Monash University Appoints Contractor for $81 Million Biomedical Facility

exteior3_credittoDentonCorkerMarshall_620x380

Monash University has appointed Multiplex as the lead contractor responsible for delivering its $81 million Biomedical Learning and Teaching Building.

Located at Monash's Clayton campus, the new building spans four levels and will provide a total of 11,400 square metres of state-of-the-art learning space for biomedical science students.

Heading up the project's design, architecture firm Denton Corker Marshall incorporated a pedagogical solution which will be presented in four "flexi labs" within the Biomedical Learning and Teaching Building.

Configured in an L shape, these laboratories will wrap around a central glazed satellite preparation area providing smaller-scale laboratory environments for 60 to 120 students. Alternatively, the four laboratories can be combined to provide a space for up to 240 students.

“We are delighted to continue our ongoing collaboration with Monash University and play a pivotal role in its vision for higher education through delivering revolutionary learning spaces,” regional managing director of Multiplex Victoria Graham Cottam said.

The new laboratories will be built to a high biosafety level standard and the façade will be pressure tested.

Awning structures will provide pedestrians and bus patrons with generous shelter while complimenting the varying context of the learning and teaching building façade screens and landscape features.

The project is scheduled for completion in November, 2018.

The contractor has also been responsible for delivering some of the most high-profile and technologically-advanced education facilities in Victoria including the $200 million Royal Melbourne Institute of Technology (RMIT), Swanston Academic Building in Melbourne’s CBD and the $100 million Faculty of Architecture, Building and Planning Building (FABP) in Parkville.

Images courtesy Denton Corker Marshall.

IndustrialAustraliaConstructionArchitectureTechnologyConstructionSector
AUTHOR
Staff Writer
"TheUrbanDeveloper.com is committed to delivering the latest news, reviews, opinions and insights into the best of urban development from Australia and around the world. "
More articles by this author
ADVERTISEMENT
TOP STORIES
Exclusive

Brains, Balls and Determination: How Salvo Property Has Shaped Melbourne’s Skyline

Marisa Wikramanayake
5 Min
Fraser and Partners founder Callum Fraser
Exclusive

Saving Our CBDs: Architect’s Blueprint Paves Way for Office-to-Resi that Works

Leon Della Bosca
8 Min
Exclusive

Watchdog’s Court Loss Throws Spotlight on Union Balancing Act

Clare Burnett
6 Min
Time and Place's The Queensbridge Building at 90 Queens Bridge Street in Melbourne's Southbank.
Exclusive

Innovation Keeps Time & Place’s Southbank Skyscraper Rising

Marisa Wikramanayake
6 Min
Breathe Architecture founder Jeremy McLeod in front of his Featherweight Home design
Exclusive

Nightingale Founder’s Bid for Affordable Architectural Kit Homes

Leon Della Bosca
7 Min
View All >
West End Stockwell Vulture Street DA hero
Development

Stockwell Files Tower Plans in West End Stomping Ground

Phil Bartsch
Novus on Victoria Chatswood
Build-to-Rent

Novus Plots Second BtR Tower for Chatswood

Renee McKeown
PBSA DA Hindmarsh Square student accomodation tower
Student Housing

Student-Friendly Adelaide Draws 35-Storey PBSA Proposal

Renee McKeown
The lowest charges for student digs in the country have helped lure the 488-bed proposal to the city’s East End...
LATEST
West End Stockwell Vulture Street DA hero
Development

Stockwell Files Tower Plans in West End Stomping Ground

Phil Bartsch
3 Min
Novus on Victoria Chatswood
Build-to-Rent

Novus Plots Second BtR Tower for Chatswood

Renee McKeown
2 Min
PBSA DA Hindmarsh Square student accomodation tower
Student Housing

Student-Friendly Adelaide Draws 35-Storey PBSA Proposal

Renee McKeown
3 Min
Woolworths Fabcot West Footscray EDM
Retail

Fabcot’s ‘Underdeveloped’ Footscray Scheme Greenlit

Clare Burnett
3 Min
View All >
ADVERTISEMENT
Article originally posted at: https://theurbandeveloper.com/articles/monash-university-appoints-contractor-81-million-biomedical-facility