The Urban Developer
AdvertiseEventsWebinars
Urbanity
Awards
Sign In
Membership
Latest
Menu
Location
Sector
Category
Content
Type
Newsletters
Untitled design (8)
25 DAYS UNTIL OUR UNMISSABLE FLAGSHIP CONFERENCE 29-31 JULY, GOLD COAST
25 DAYS UNTIL OUR FLAGSHIP CONFERENCE 29-31 JULY, GOLD COAST
SECURE YOUR SPOTDETAILS
TheUrbanDeveloper
Follow
About
About Us
Membership
Awards
Events
Webinars
Listings
Resources
Terms & Conditions
Commenting Policy
Privacy Policy
Republishing Guidelines
Editorial Charter
Complaints Handling Policy
Contact
General Enquiries
Advertise
Contribution Enquiry
Project Submission
Membership Enquiry
Newsletter
Stay up to date and with the latest news, projects, deals and features.
Subscribe
ADVERTISEMENT
SHARE
5
print
Print
OtherTed TabetMon 29 Mar 21

University Completes Victoria’s Largest Timber Project

516f5f96-e633-4ebe-be89-21806da9dc16

La Trobe University, in Melbourne’s north-east, has completed Victoria’s largest mass timber project.

The $100-million student accommodation project at its Bundoora campus was built from 4500 cubic metres of eco-friendly cross-laminated timber (CLT) and glue-laminated timber, or glulam.

The project, with 624-beds across two separate six-level buildings, marks the largest single investment in La Trobe University’s 50-year history.

The development was designed by Jackson Clements Burrows Architects.

Multiplex regional managing director Graham Cottam said the use of CLT—a non-toxic, fire-resistant, renewable resource with a long-life cycle—had halved the embodied carbon in the development.

It has also achieved a 5-Star Green Star design rating and is targeting a 5-Star Green Star as-built rating.


Interested in understanding more about timber tower construction? Join us for a webinar 1 April 2021. Click here to purchase your ticket.


Multiplex said during construction, three cranes were used to lift and place more than 2700 individual mass timber elements, including the building’s structure, prefabricated pods and facade.

CLT has become a popular building material in Australia in recent years due to the speed of fabrication and cost effectiveness.

Its viability gained a considerable impetus after the National Construction Code introduced less onerous requirements for timber towers of up to eight storeys.

The innovative material has the structural strength of more traditional methods using concrete and steel.

The combined energy to produce the material in Europe and ship it to Australia remains lower than the energy it takes to locally produce materials such as concrete and steel.

It is also a good insulator as it resists heat, it can be simply disassembled and reused for future projects and, significantly, it produces less greenhouse gas emissions.

▲ According to Multiplex, approximately 1200 people worked on-site during construction. Image: Supplied


The completed project forms part of a broader initiative by the university to provide housing for 12,000 residents, including staff and students, in varying formats and ownership models.

The $5bn masterplan includes the development of a new city centre on the Bundoora campus with a substantial mix of commercial and retail facilities.

The university will piggy-back off that development to create significant cultural facilities within the city centre.

Another major component in the masterplan is a Health and Wellbeing Hub that will include aged care, childcare and super-clinic facilities.

La Trobe, which already holds a 6-Star Green Star Communities rating, is striving to become Victoria’s first net zero carbon emission university by 2029 with its regional campuses on track to be carbon neutral by 2022.

ResidentialAustraliaMelbourneConstructionConstructionSector
AUTHOR
Ted Tabet
The Urban Developer - Journalist
More articles by this author
website iconlinkedin icon
ADVERTISEMENT
TOP STORIES
Exclusive

Carparking Correlation: How Parking Fees Provide Office Sector Health Check

Taryn Paris
6 Min
Molti chief Ben Teague out front of 32 Mercer Road Aramadale (rendering)
Exclusive

Buy to the Sound of Cannons: Molti’s Counter-Cyclical Move to Melbourne

Leon Della Bosca
5 Min
Exclusive

Tapping the Bunnings ‘Halo Effect’

Taryn Paris
5 Min
Exclusive

‘Construction Not a Scale Game’: Hutchinson

Phil Bartsch
9 Min
Nation's build-to-rent project Charlie Parker in Sydney's Parramatta where more projects are being located and built outside the CBD.
Exclusive

Foreign Capital Still Dominates BtR but Things are Changing

Marisa Wikramanayake
7 Min
View All >
Bunnings Clyde North
Markets

Bunnings Sold On as Charter Hall Doubles Down on Retail

Leon Della Bosca
Exclusive

Carparking Correlation: How Parking Fees Provide Office Sector Health Check

Taryn Paris
the four concept towers approved for sydney metro's parramatta precinct
Development

Rush of Approvals Sends Parramatta Skywards

Renee McKeown
Two projects of six towers, including a 47-storey build-to-rent scheme, have moved ahead as Sydney’s second CBD grows up…
LATEST
Bunnings Clyde North
Markets

Bunnings Sold On as Charter Hall Doubles Down on Retail

Leon Della Bosca
2 Min
Exclusive

Carparking Correlation: How Parking Fees Provide Office Sector Health Check

Taryn Paris
6 Min
the four concept towers approved for sydney metro's parramatta precinct
Development

Rush of Approvals Sends Parramatta Skywards

Renee McKeown
2 Min
The construction site which will one day become Newcastle Tallest Tower by Urban Property Group
Residential

Urban Property Group Reveals Newcastle Tallest Tower Plan

Renee McKeown
3 Min
View All >
ADVERTISEMENT
Article originally posted at: https://theurbandeveloper.com/articles/la-trobe-university-victoria-largest-timber-project