The Urban Developer
AdvertiseEventsWebinarsUrbanity
Industry Excellence
Urban Leader
Sign In
Membership
Latest
Menu
Location
Sector
Category
Content
Type
Newsletters
UPCOMING EVENT - INDUSTRIAL AND LOGISTICS SUMMIT 16 OCTOBER, SYDNEY
INDUSTRIAL AND LOGISTICS SUMMIT - TICKETS NOW ON SALE
LEARN MOREDETAILS
TheUrbanDeveloper
Follow
About
About Us
Membership
Awards
Events
Webinars
Listings
Resources
Terms & Conditions
Commenting Policy
Privacy Policy
Republishing Guidelines
Editorial Charter
Complaints Handling Policy
Contact
General Enquiries
Advertise
Contribution Enquiry
Project Submission
Membership Enquiry
Newsletter
Stay up to date and with the latest news, projects, deals and features.
Subscribe
ADVERTISEMENT
SHARE
print
Print
PlanningMarisa Wikramanayake AND Renee McKeownSun 09 Feb 25

Gurner Files Plans for More Towers at Elysium Fields

Fraser and Partners's render of Tower 4 and 5 in Gurner Group's Elysium Fields project at Digital Drive in Melbourne's Docklands.

Gurner Group has filed more plans for its $1.7-billion project earmarked for an infill site in the heart of Melbourne’s Docklands.

The 27,000sq m site at 25 Digital Drive, Docklands, has been earmarked for Gurner’s $1.7-billion Elysium Fields. It also has the addresses of 208-226 Harbour Esplanade and 58-64 Digital Drive.

Plans by architects Fraser and Partners now before the Victorian Department of Transport and Planning propose two towers as stage 4 and 5.

Stage 4 is a 28-storey Tower 5 of 222 apartments comprising112 one-bedroom, 90 two-bedroom and 20 three-bedroom units. 

Stage 5 is the 38-storey, 158 apartment Tower 4 of 76 one-bedroom, 58 two-bedroom, 22 three-bedroom and 2 four-bedroom units. 

Stage 4 would be built on a 2050sq m section of the site while Stage 5 on a 2957sq m portion. 

Both would share a seven-storey podium. 

A hotel component is included with 136 rooms proposed for levels 7 to 36 of Tower 4 and 102 keys on levels 1 to 6 of Tower 5.

Hotel amenities, including lounge, gym, conference space, outdoor space and co-working areas, are proposed for level 6 of Tower 5.

A render of Gurner Group's Elysium Fields project by architects Fraser and Partners.
▲ A render of Elysium Fields by architects Fraser and Partners.

Office and retail spaces have been proposed for the shared podium along with food and beverage spaces, a gym and lobbies for the hotel and residential components.

Tower 4 would have 9066sq m of office space and 389sq m of retail space while Tower 5 would have 120sq m of retail space and 4336sq m of office space.

There would be 116 carparking bays on levels 1 to 4 for Tower 4 and 102 carparking bays on levels 1 to 5 for Tower 5. 

Existing above-ground carparking space on the site will be removed before construction begins. An extension to Digital Drive is included in the plans. 

Gurner received planning approval for the project in October and subdivision in December . At the time, Gurner founder Tim Gurner told The Urban Developer that construction would begin before the end of 2024. 

“With the subdivision permit now approved for the first stage of Elysium Fields, construction is on track to commence before the end of the year,” Gurner said.

The first stage of the project includes the first three towers, each on their own separate lot within the site. 

render of a jacaranda in the middle of a road surrounded by Singapore inspired buildings in Docklands Melbourne
▲ A render of Elysium Fields. The first stage is expected to launch this year.

Gurner’s plans for the first stage include 700 apartments across the first three towers with a proportion of the units set up as build-to-rent apartments. 

Hamilton Marino has been contracted to build the first tower.

Tower 1 is expected to be launched early this year with 250 luxury build-to-sell apartments.

The City Harbour consortium, which includes the Liberman family, is part of a joint venture with Gurner to work on the project and holds the development rights to it.

Gurner first announced the project in March with renders of a biodome over the project.

Anti-ageing and health facilities will be part of the project design including cryotherapy, saunas, a medical clinic providing MRIs, blood tests, brain scans and personalised health plans.

The developer has also announced that it plans to launch $3.5 billion in projects this year.

ResidentialRetailHotelOfficeBuild-to-RentMelbourneDevelopmentPlanningUrban DesignPlacemakingPlanningProject
AUTHOR
Marisa Wikramanayake
The Urban Developer
More articles by this author
AUTHOR
Renee McKeown
More articles by this author
ADVERTISEMENT
TOP STORIES
Salta MD Sam Tarascio
Exclusive

Why Salta Won’t Break Ground on $400m Pipeline

Leon Della Bosca
7 Min
Exclusive

Precinct Proposals Bloom as Brisbane Middle-Ring Sheds its Past

Phil Bartsch
8 Min
Exclusive

Newest Land Lease Player Plots Sector Shake-Up

Taryn Paris
5 Min
Waterloo Affordable Mirvac hero
Exclusive

Affordable Housing Rules Tighten as Proposal Deluge Continues

Clare Burnett
5 Min
Exclusive

Beyond the Aerotropolis: How Airports are Turning into Cities

Taryn Paris
6 Min
View All >
Life Sciences

NSW Healthcare Asset Portfolio Comes to Market

Lindsay Saunders
Planning

State Goes Public with Plans for 10,000 Victorian Homes

Lindsay Saunders
Sponsored

Bondor Metecno’s MetSeam Elevates Facade Design Style

Partner Content
Compose your facade design with MetSeam — aluminium fins that bring rhythm, style and performance without added complexi…
LATEST
Life Sciences

NSW Healthcare Asset Portfolio Comes to Market

Lindsay Saunders
4 Min
Planning

State Goes Public with Plans for 10,000 Victorian Homes

Lindsay Saunders
2 Min
Architecture

Bondor Metecno’s MetSeam Elevates Facade Design Style

Partner Content
5 Min
Exclusive

Dark Horse: Self Storage Sector’s Biggest Players

Shravanth Reddy
3 Min
View All >
ADVERTISEMENT
Article originally posted at: https://www.theurbandeveloper.com/articles/gurner-group-elysium-fields-docklands-mixed-use-project-plans-stage-4-5-filed