The Urban Developer
AdvertiseEventsWebinars
Urbanity
Awards
Sign In
Membership
Latest
Menu
Location
Sector
Category
Content
Type
Newsletters
Untitled design (8)
2 WEEKS UNTIL OUR UNMISSABLE FLAGSHIP CONFERENCE MORE THAN 550 ALREADY ATTENDING
2 WEEKS UNTIL OUR FLAGSHIP CONFERENCE 550+ ALREADY ATTENDING
REGISTER NOWDETAILS
TheUrbanDeveloper
Follow
About
About Us
Membership
Awards
Events
Webinars
Listings
Resources
Terms & Conditions
Commenting Policy
Privacy Policy
Republishing Guidelines
Editorial Charter
Complaints Handling Policy
Contact
General Enquiries
Advertise
Contribution Enquiry
Project Submission
Membership Enquiry
Newsletter
Stay up to date and with the latest news, projects, deals and features.
Subscribe
ResidentialStaff WriterWed 11 Oct 17

COBE Complete Transformation of Copenhagen Grain Silo

TUD+ MEMBER CONTENT
The_Silo_12_credit_Rasmus_Hjortsho_j_COAST_1650
SHARE
print
Print

Copenhagen firm COBE along with clients Klaus Kastbjerg and NRE Denmark have unveiled the completed transformation of a former grain silo in Copenhagen’s recently redeveloped north harbour.

The building is located in the Nordhavn, Copenhagen, which is currently being converted into a new city district that retains some of the original industrial structures.

Over the next 40 to 50 years, over four million square metres of the post-industrial harbour area will be redeveloped.

The 17-storey silo has been redeveloped into a residential apartment building with 38 unique units. The single and multi-level apartments range from 106 square metres to 401 square metres with floor heights up to seven metres.

Related reading: Disused Grain Silo Transformed Into Africa’s First Contemporary Art Institution

All apartments have panoramic, floor-to-ceiling windows and balconies. The window frames are hidden on the outside of existing concrete walls, offering expansive views of the city skyline and the Oresund Coast.

Both the top and lower levels are open to the public. The top floor consists of a restaurant with 360-degree views of the city with the ground floor available for public events.

The process of transforming the former grain silo into apartments required openings to be carved into the solid concrete, creating space for windows and balconies that wrap around all four sides.

A new layer of cladding made from galvanised steel was added to bring the facades up to meet contemporary standards, while maintaining the building overall tall, slender shape.

"We wanted to retain the spirit of The Silo as much as possible – both in terms of its monolithic exterior and majestic concrete interior, by simply draping it with a new overcoat," COBE founder Dan Stubbergaard said.

"The Silo will be inhabited, but at the same time it will be a destination. An urban trigger and anchor point for the new development of Nordhavn," Stubbergaard said.

The Silo was completed in May 2017, upon the arrival of its first guests. The restaurant on the top floor is due to open later this year.

IndustrialInternationalArchitectureSector
AUTHOR
Staff Writer
"TheUrbanDeveloper.com is committed to delivering the latest news, reviews, opinions and insights into the best of urban development from Australia and around the world. "
More articles by this author
ADVERTISEMENT
TOP STORIES
The Port of Brisbane has released its Vision 2060 which details the need for inland rail connectivity
Infrastructure

Brisbane Port’s $15bn Future Faces One Big Obstacle

Renee McKeown
5 Min
Freecity Rouse Hill triple towers 2 Tempus Street
Exclusive

Freecity Takes Covers Off $330m Triple Towers in Sydney’s North-West

Leon Della Bosca
5 Min
Parallel Workshops Stockdale Housing PBSA project
Exclusive

Suburban Success Story Turns PBSA Thinking on its Head

Leon Della Bosca
7 Min
Exclusive

Interstate Developers Find Lots to Love in ‘Progressive, Affordable’ SA

Taryn Paris
5 Min
Bates Smart Richmond Sportslink HERO
Exclusive

BtR Focus Drives Bates Smart’s Richmond Sportslink Concept

Leon Della Bosca
6 Min
View All >
Industrial

Inland Rail: Site at Rural Hub Comes to Market in Victoria

Lindsay Saunders
Stockland's Triniti HERO
Build-to-Rent

Stockland $400m North Ryde BtR Approved on Appeal

Leon Della Bosca
Logan Wastewater Funding hero
Infrastructure

Flush of Funding to Deliver 20,000 New SEQ Homes

Phil Bartsch
Without the $135.98-million injection it is claimed the Logan City Council would have had to stop approving new housing …
LATEST
Industrial

Inland Rail: Site at Rural Hub Comes to Market in Victoria

Lindsay Saunders
2 Min
Stockland's Triniti HERO
Build-to-Rent

Stockland $400m North Ryde BtR Approved on Appeal

Leon Della Bosca
3 Min
Logan Wastewater Funding hero
Infrastructure

Flush of Funding to Deliver 20,000 New SEQ Homes

Phil Bartsch
3 Min
The Port of Brisbane has released its Vision 2060 which details the need for inland rail connectivity
Infrastructure

Brisbane Port’s $15bn Future Faces One Big Obstacle

Renee McKeown
5 Min
View All >
ADVERTISEMENT
Article originally posted at: https://theurbandeveloper.com/articles/cobe-complete-transformation-copenhagen-grain-silo