Sponsored Content
Partner Content
Mon 12 Oct 26

Building Living Sector Assets for Decades, from Day One

WT residential buildings
Add us as a preferred source on Google

WT national directors Adam Adkin and Andrew Van Meel explain why living-sector projects should be judged on what they will cost to run over decades, as well as what they cost to build.



Australia’s housing challenge is usually framed as an issue of supply, but there’s more to it.

The buildings going up now across build-to-rent (BtR), purpose-built student accommodation (PBSA), retirement living, co-living and social and affordable housing will probably still be operating in the 2060s.

Delivery speed is important, but so is how much these buildings will cost to run and whether people will want to keep living in them. It’s this perspective that must drive feasibility and priorities.

Why the market is changing


Larger, longer-term owners and specialist operators now dominate many living sectors, and they measure value in decades of cashflow, not as a single completion cost.

These ownership models rely on confidence about operations: investors expect predictable maintenance regimes, stable energy use, fully planned and budgeted asset replacement schedules, and satisfied residents who stay.

Occupants are expecting better amenity and service, which raises the bar for design and facilities management.

These factors create a market that rewards whole-of-life thinking. For projects to perform, efficient operation and lifecycle cost must be locked in from the start.

Don’t underestimate the cost of short-term decision making


Across a typical asset life, the money spent maintaining, servicing, cleaning, powering and eventually replacing elements of the building will far outstrip the money spent in design and construction. Assets and systems that may be cheapest at tender could be the most expensive when we consider their total cost of ownership.

WT national director and national digital solutions lead Andrew Van Meel and national director and national asset and facilities management lead Adam Adkin
▲ WT national director and national digital solutions lead Andrew Van Meel and national director and national asset and facilities management lead Adam Adkin.

Decisions are often made under delivery pressure by people who won’t feel the long-term cost impact.

Bespoke components may increase the complexity of getting spare parts. Finishes chosen for speed or cost savings may demand more frequent replacement. A facade that saves on capex but requires frequent maintenance could become a liability.

These are predictable consequences of decisions that prioritise delivery speed over lifecycle certainty. Once these decisions are baked in, they set the operating cost for the building, which can be hard to shift.

This means that feasibility should model multiple scenarios and make trade-offs visible and comparable by looking at outcomes across different time horizons.

Every early conversation needs to shift from ‘what’s cheapest now?’ to ‘what will deliver the best total cost of ownership and satisfy residents?’

Incorporating a facilities management (FM) perspective early can guide design choices based on real maintenance constraints, which will reduce friction at handover.

Cost estimating should rigorously capture complexity rather than smoothing it away. The design process needs to be disciplined and limit late-stage change.

And careful, strategic choices must be made about the most-effective delivery model (such as considering modular construction for speed to market or adaptive reuse to capitalise on premium location).

The sectors differ, but the same logic applies


Across build-to-rent, co-living, purpose built student accommodation, retirement living and social and affordable housing, the commercial mechanics and tenant priorities differ but the importance of a long-term view is the same.

Social and affordable housing must prioritise durability and maintainability to minimise long-term operating cost.

Melbourne PBSA rooftops
▲ Rooftop amenity attracts students, but long-term running costs need to be planned from the outset.

PBSA benefits from disciplined standardisation, robust finishes and the latest digital integration to meet student expectations and maximise per-bed income.

Build-to-rent needs amenity calibrated against operating cost so yield is maintained.

Retirement living demands premium amenity, minimal disruption and clubhouse-centric design to attract downsizers, with predictable lifecycle cost to ensure appropriate returns.

The fundamental levers across all sectors are the same: rigorous feasibility, lifecycle cost modelling, repeatable delivery, FM alignment, and effective digital solutions that deliver usable asset information.

Digital solutions turn information into a long-term asset


Better decisions depend on reliable information. BIM governance, reality capture, structured asset data and reporting can help project teams test options and coordinate design and delivery. They also provide operators with more useful information at handover.

Their value depends on establishing clear information requirements early, including relevant deliverables in project documentation, and maintaining accountability for data quality throughout delivery.

Without this discipline, information can become incomplete or outdated as it moves between design, construction and operation.

Architect BIM
▲ Well-managed digital models help project teams test design options early and hand operators more useful asset data.

Well-governed information supports more confident decisions during delivery and provides a stronger foundation for maintenance, capital planning and future asset interventions.

Short-term gains or enduring value?


The living sectors are facing similar challenges to every other construction project, with volatile construction costs and stretched contractor capacity.

Operating expectations across all residential asset classes continue to rise and the pressure to get to market is intense. But the next phase of growth in the living sectors will be defined by assets that best manage cost and performance over time.

Long-term performance is the common ground where value for developers and community converge, and it depends on asking from Day 1 what Year 30 might hold. 

About WT


WT is a leading international project advisory firm with more than 75 years of multi-sector experience. Our clients can tap into the collective thinking of over 2,000 of the best people in the industry, operating from 70+ offices throughout Australia, New Zealand, Asia, India, Middle East, North America, Africa, the UK and Europe. In Australia, we support our clients across property, construction and infrastructure with an award-winning team of 500 specialists in portfolio and program advisory, cost management and quantity surveying, commercial advisory, carbon and sustainability, asset and facilities management, and digital solutions.

About the authors


Adam Adkin is national director and national asset and facilities management lead at WT. A facilities management specialist focused on FM strategy and performance management, he has published widely on asset data capture and asset management principles, and advises WT clients across a range of built environment sectors.

Andrew Van Meel is national director and national digital solutions lead at WT. He specialises in how digital technologies such as building information modelling (BIM), data management and visualisation can lift innovation and productivity in construction, with a focus on large-scale commercial and residential projects.



The Urban Developer is proud to partner with WT to deliver this article to you. In doing so, we can continue to publish our daily news, information, insights and opinion to you, our valued readers.

Article originally posted at: https://www.theurbandeveloper.com/articles/wt-lifecycle-cost-build-to-rent-pbsa-feasibility