The Urban Developer
AdvertiseEventsWebinarsUrbanity
Industry Excellence
Urban Leader
Sign In
Membership
Latest
Menu
Location
Sector
Category
Content
Type
Newsletters
Urban Leader Awards Logos RGB White
NOMINATIONS CLOSE SEPTEMBER 12 RECOGNISING THE INDIVIDUALS BEHIND THE PROJECTS
NOMINATIONS CLOSING SEPTEMBER 12 URBAN LEADER AWARDS
LEARN MOREDETAILS
TheUrbanDeveloper
Follow
About
About Us
Membership
Awards
Events
Webinars
Listings
Resources
Terms & Conditions
Commenting Policy
Privacy Policy
Republishing Guidelines
Editorial Charter
Complaints Handling Policy
Contact
General Enquiries
Advertise
Contribution Enquiry
Project Submission
Membership Enquiry
Newsletter
Stay up to date and with the latest news, projects, deals and features.
Subscribe
ADVERTISEMENT
SHARE
print
Print
ResidentialClare BurnettMon 13 Jan 25

Heritage Reuse Shoptop Plans Filed in Perth’s North-West

Wembley Shoptop EDM

Plans have been filed for a heritage adaptive reuse shoptop project in a growing suburb in Perth’s north-west. 

The proposal for a seven-storey building at 288-290 Cambridge Street, Wembley, in the Town of Cambridge are now open for public consultation as the Western Australian Planning Commission considers their merits. 

The scheme has been put forward by Syncroni Project No1, a vehicle associated with two executives from the real estate sales, leasing and management company Realmark—managing director John Percudani and chief financial officer Ben Della Vedova.

Proposed for the 1366sq m site are 35—eight of one bedroom, 26 two bedroom apartments and a single three bedroom unit.

The project would also have two ground-floor tenancies, replacing part of the single-storey commercial buildings on the site presently, as well as 58 carparking bays for residents and loading.

The Rothelowman-designed plans include an outdoor area, landscaped rooftop terrace and common areas including a lounge, plunge pool, sauna and fire pits.

It will have “a refined, modern aesthetic that both complements the existing heritage component on the site but also pay homage to the existing built form vernacular”, according to the planning documents.

null
▲ A render of the Cambridge project streetscape by Rothelowman.

The $24-million build is a somewhat complicated, as part of the site, 288 Cambridge Street, includes a Town of Cambridge heritage-listed interwar building with “distinctive pyramid ornamentation” built in the late 1920s.

The plans will retain and refurbish the heritage shopfront and parapet, remediating “the deterioration of the existing fabric”.

Wembley, 3.8km north-west of Perth CBD and 1km north-west of the Subiaco town centre, has been earmarked as a local town centre. 

As well as being tipped as a growing commercial centre, Wembley and the Town of Cambridge more broadly are aiming to reach 17,100 homes as their part of Perth and Peel @ 3.5 Million, a framework striving to house 3.5 million people in those two WA regions by 2050. 

Currently sitting at 122.7 new homes a year, there is considerable room to grow in Cambridge, as its target requires 193.2 homes to be built every year to reach that target.

ResidentialRetailPerthPlanningArchitectureConstructionPlanningProject
AUTHOR
Clare Burnett
More articles by this author
ADVERTISEMENT
TOP STORIES
Stockland bumps up its apartment pipeline in melbourne and sydney
Exclusive

Stockland Re-Enters Density in $5bn Apartment Play

Renee McKeown
4 Min
Woolloongabba Precinct Vulture St
Exclusive

Brisbane Developer in Cross River Rail Compensation Tussle

Clare Burnett
4 Min
The Mondrian Gold Coast hotel's food and beverage is driving profits
Exclusive

Touch, Taste, Theatre: What’s Driving Mondrian’s Success

Renee McKeown
6 Min
Fortis’ display suites are designed as brand environments first, with tactile details and curated design to build buyer confidence before project specifics.
Exclusive

Relevant or Redundant: Will Tech Kill Display Suites?

Vanessa Croll
7 Min
Exclusive

Missing Heart: Why The Gold Coast Needs a CBD

Phil Bartsch
7 Min
View All >
The Adelaide purpose built student accommodation market is about to increase by 1058 beds with the State Commission Assessment Panel supporting two towers in the making.
Student Housing

Highrise Approvals Add 1000-Plus PBSA Beds in Adelaide

Renee McKeown
Stockland bumps up its apartment pipeline in melbourne and sydney
Exclusive

Stockland Re-Enters Density in $5bn Apartment Play

Renee McKeown
South Melbourne social housing precinct
Affordable & Social Housing

South Melbourne Housing Precinct Revamp Takes Next Step

Leon Della Bosca
The Dorcas Street project replaces demolished walk-ups with 131 modern apartments, the first step in a multi-stage redev…
LATEST
The Adelaide purpose built student accommodation market is about to increase by 1058 beds with the State Commission Assessment Panel supporting two towers in the making.
Student Housing

Highrise Approvals Add 1000-Plus PBSA Beds in Adelaide

Renee McKeown
3 Min
Stockland bumps up its apartment pipeline in melbourne and sydney
Exclusive

Stockland Re-Enters Density in $5bn Apartment Play

Renee McKeown
4 Min
South Melbourne social housing precinct
Affordable & Social Housing

South Melbourne Housing Precinct Revamp Takes Next Step

Leon Della Bosca
2 Min
JQZ Parramatta EDM
Residential

JQZ Plots 10-Storey Addition to Parramatta ‘Auto Alley’ Plans

Clare Burnett
3 Min
View All >
ADVERTISEMENT
Article originally posted at: https://www.theurbandeveloper.com/articles/heritage-reuse-shoptop-plans-filed-in-perth-north-west-wa