ApartmentsPatrick LauWed 25 Nov 26

Hong Kong Developer Looks For Uplift in $98m Chatswood Highrise

A 2023 approval has been scrapped and another seven storeys and 31 apartments added to the North Shore proposal…

The rise and rise of the North Shore as an epicentre of state-significant residential towers continues as KDC Australia’s 35-storey Chatswood scheme goes on show.

The $98-million scheme would rise from a 1185sq m site about 500m south of the Chatswood train station and 8.5km north of the Sydney CBD.

The 83-apartment project at 629-639 Pacific Highway sits in a development cluster of highrise state-significant residential projects around the town centre.

Retail and commercial uses on the ground and first floors would be topped by 60 two and 23 three-bedroom apartments.

An affordable component would include four apartments held in perpetuity and 16 managed by a community housing provider for 15 years.

The 93 car parking spaces would be in five levels of basement.

A floor space ratio of 7.781:1 would yield 9223sq m of gross floor area.

A render of the KDC tower proposed for Chatswood
▲ The latest iteration of the project expands on the 2023-approved design.

The PBD Architects-designed project is about 300m from the TX Australia broadcasting tower at 192-196 Hampden Road.

A 2023 application on the KDC site for 52 apartments across 27 storeys was approved—the latest application wants a 30 per cent uplift under the 2021 Housing SEPP.

However, the latest application uses an evolution of the earlier design, rather than proposing a new one.

A render of the KDC project at CHatswood from ground level looking upwards
▲ Height and yield have been pushed upwards, with the inclusion of an affordable housing component.

An engineering report in the application bundle said that the electromagnetic radiation from that tower would not impact human health, but that electronic equipment in the KDC building may experience interference.

Radiofrequency shielding measures such as metal sheet cladding or aluminium foil lining would reduce the risk of interference, the report states.

Another TX tower at Willoughby was demolished for residential redevelopment in 2021.

A render of the KDC project being progressed at 688 Pacific Highway
▲ A second KDC project is under way at 688-692 Pacific Highway.

KDC is progressing a second Chatswood project at 688-692 Pacific Highway. That seven-storey scheme would yield 33 apartments.

KDC rebranded from Polytec Australia in August 2026. The company is a branch of the Hong Kong-listed Kowloon Development Company, controlled by the Polytec Group in that jurisdiction.

Written by

Article originally posted at: https://www.theurbandeveloper.com/articles/629-639-pacific-highway-kdc-polytec-exhibition-nsw-sydney-chatswood