The Urban Developer
AdvertiseEventsWebinarsUrbanity
Industry Excellence
Urban Leader
Sign In
Membership
Latest
Menu
Location
Sector
Category
Content
Type
Newsletters
Urban Leader Awards Logos RGB White
NOMINATIONS CLOSE SEPTEMBER 12 RECOGNISING THE INDIVIDUALS BEHIND THE PROJECTS
NOMINATIONS CLOSING SEPTEMBER 12 URBAN LEADER AWARDS
LEARN MOREDETAILS
TheUrbanDeveloper
Follow
About
About Us
Membership
Awards
Events
Webinars
Listings
Resources
Terms & Conditions
Commenting Policy
Privacy Policy
Republishing Guidelines
Editorial Charter
Complaints Handling Policy
Contact
General Enquiries
Advertise
Contribution Enquiry
Project Submission
Membership Enquiry
Newsletter
Stay up to date and with the latest news, projects, deals and features.
Subscribe
ADVERTISEMENT
SHARE
1
print
Print
Sponsored ContentPartner ContentMon 07 Nov 22

New Concrete Bridge Passes Flood Tests

When it came time to replace the historic but flood-prone Windsor Bridge, in Sydney’s north-west, there was really only one choice in terms of durability and resilience. 

At A Glance


Project: Windsor Bridge
Builder: Georgiou
Main Concrete Elements:

  • Incrementally launched precast bridge sections

  • Concrete piles/piers, abutments

Photography: Jenny Evans/Getty Images and Mark Bowmer

Originally built for horse-drawn vehicles and foot traffic in 1874, the Windsor Bridge had reached the end of its life by the early 2000s.

Constructing something high enough to completely escape floodwaters wasn’t feasible, so the challenge was to construct a replacement bridge that could better cope and rebound from severe flood events.

Solution and outcome


At 156m long, the new bridge comprises three lanes—two southbound and one northbound.

It is located 35m downstream of its predecessor and is 3m higher at the northern bank and 6m at the southern bank.

Delivered by contractor Georgiou, the new bridge was constructed as an incrementally launched bridge, with 10 concrete segments cast in a bed on the northern bank before being launched across the river.
The bridge superstructure is supported by four piers in the river. The piles for these piers were constructed from steel tubes filled with reinforced concrete, then topped with precast concrete pile cap ‘shells’ filled with concrete to support the bridge columns.

Abutment and retaining walls on each side of the river are also concrete.

Although the flood immunity of the new bridge is around the one-in-three-year flood level (compared to one-in-two for the old bridge), its real benefit stems from its strength and ability to resist damage that would otherwise result in lengthy and costly repairs.

The bridge faced its first major flood test in March 2021—less than 12 months after completion—when it was submerged during the disastrous Eastern Australia floods.

In March 2022 it was flooded again.

Although the bridge went under water on each occasion, it re-emerged relatively unscathed—meaning this essential piece of infrastructure could be reopened to the community much more quickly than would have been the case with the old bridge.

Benefits of using concrete:

  • Flood resilience—ability to withstand and reopen after severe flood events

  • Durability and strength



The Urban Developer
is proud to partner with Cement Concrete and Aggregates Australia to deliver this article to you. In doing so, we can continue to publish our daily news, information, insights and opinion to you, our valued readers. 

OtherInfrastructureAustraliado not useOther
AUTHOR
Partner Content
More articles by this author
ADVERTISEMENT
TOP STORIES
Stockland bumps up its apartment pipeline in melbourne and sydney
Exclusive

Stockland Re-Enters Density in $5bn Apartment Play

Renee McKeown
4 Min
Woolloongabba Precinct Vulture St
Exclusive

Brisbane Developer in Cross River Rail Compensation Tussle

Clare Burnett
4 Min
The Mondrian Gold Coast hotel's food and beverage is driving profits
Exclusive

Touch, Taste, Theatre: What’s Driving Mondrian’s Success

Renee McKeown
6 Min
Fortis’ display suites are designed as brand environments first, with tactile details and curated design to build buyer confidence before project specifics.
Exclusive

Relevant or Redundant: Will Tech Kill Display Suites?

Vanessa Croll
7 Min
Exclusive

Missing Heart: Why The Gold Coast Needs a CBD

Phil Bartsch
7 Min
View All >
Stockland bumps up its apartment pipeline in melbourne and sydney
Exclusive

Stockland Re-Enters Density in $5bn Apartment Play

Renee McKeown
South Melbourne social housing precinct
Affordable & Social Housing

South Melbourne Housing Precinct Revamp Takes Next Step

Leon Della Bosca
The Adelaide purpose built student accommodation market is about to increase by 1058 beds with the State Commission Assessment Panel supporting two towers in the making.
Student Housing

Highrise Approvals Add 1000-Plus PBSA Beds in Adelaide

Renee McKeown
The two towers, of 35 and 34 storeys, help cement the SA capital’s growing status as the best place in Australia for the…
LATEST
Stockland bumps up its apartment pipeline in melbourne and sydney
Exclusive

Stockland Re-Enters Density in $5bn Apartment Play

Renee McKeown
4 Min
South Melbourne social housing precinct
Affordable & Social Housing

South Melbourne Housing Precinct Revamp Takes Next Step

Leon Della Bosca
2 Min
The Adelaide purpose built student accommodation market is about to increase by 1058 beds with the State Commission Assessment Panel supporting two towers in the making.
Student Housing

Highrise Approvals Add 1000-Plus PBSA Beds in Adelaide

Renee McKeown
3 Min
JQZ Parramatta EDM
Residential

JQZ Plots 10-Storey Addition to Parramatta ‘Auto Alley’ Plans

Clare Burnett
3 Min
View All >
ADVERTISEMENT
Article originally posted at: https://www.theurbandeveloper.com/articles/new-concrete-bridge-passes-flood-tests