Four Energy Decisions That Pay Off Long After Handover

Get them right in planning and developers can avoid costly redesigns, gain a selling point and may even open a new income stream…

Humenergy consultants working out power needs

Most energy decisions in a new apartment building are made once, and residents, owners and body corporates live with them for decades.

Get them right at the planning stage and developers avoid costly redesigns, gain a selling point and may even open a new income stream.

With the energy transition reshaping how buildings are powered, early planning holds the key to apartments that are cheaper, cleaner and simpler to run, according to Humenergy managing director Ben Humphreys.

Energy planning provides better outcomes


Benefits start at design and documentation, when choices about the network, hot water and electrical load can be made before they lock in cost.

Ideally, Humenergy sits down with developers at that stage to understand their objectives, tailor a solution and then roll it out across their projects so each development doesn’t start from scratch.

“We get standardisation, which can then drive better sustainability outcomes, cost efficiencies and quality,” Humphreys said.

Pre-sales is the latest point to bring a partner on board, because energy agreements must be disclosed in sales documents.

Humenergy managing director Ben Humphreys
▲ Humenergy managing director Ben Humphreys works with developers to plan a building’s energy from the design stage.

Four decisions to make before breaking ground


1. Embedded network or not

Whether to install an embedded network is the biggest call, and nearly all developers now choose one, according to Humphreys.

As a guide, a building of about 30 standard apartments, or as few as 10 very large whole-of-floor apartments, uses enough electricity to justify one.

For developers, handing compliance to a specialist removes a growing risk, as overlapping national, state and strata legislation carries ever-steeper penalties.

2. How hot water is delivered

Hot water is the second decision, and it can make or break a project’s electrical budget.

Centralised gas systems are highly efficient and take load off the grid, but policy is pushing projects towards electrification.

Instantaneous electric units are the usual alternative, but they need three-phase power to every apartment, adding significant cost to the build and driving up peak demand.

“I have heard an example where [the network] knocked it back and said, ‘No, we’re not giving you that much power,’” Humphreys said.

Humphreys said centralised heat pump systems avoid much of that extra cost and load.

“If we do have to go all electric, then the centralised heat pump is probably going to be a really good solution,” he said.

Depending on usage and building size, bulk hot water can typically deliver savings for residents of 25 per cent or more.

Humenergy hot water decisions
▲ Solar inverters convert rooftop power for use across the building, and early planning helps a development make the most of it.

3. Who owns the assets

Ownership of the energy assets may be the decision with the biggest upside for developers.

Developers playing an active role in the building after construction through management rights or property management are looking for ways to create more value for their communities and businesses.

And investing in energy assets is one way they can do that.

Humenergy has a customisable energy solution that allows developers to invest and own energy assets in their buildings.

“If the developer is incentivised to invest more capital into renewable and clean energy solutions and can earn a small return on those assets while also carrying maintenance obligations, well, that’s a good outcome for the community,” Humphreys said.

Scale works in their favour, because the capital needed per apartment falls as buildings get bigger.

Portfolio developers stand to gain most, as the same model can be standardised across every project.

4. How far to push renewables

Renewable energy feeds into Green Star ratings and NatHERS compliance and gives developers a strong selling point at the sales stage.

Rooftops are rarely big enough to power a whole apartment building, but an embedded network can contract green energy from elsewhere for every resident.

Humenergy solar rooftop panels
▲ Rooftop solar helps a building’s green credentials, but an embedded network can bring in renewable energy from beyond the roof.

Existing buildings benefit too


Residents of a 216-apartment building in Southport that Humenergy converted to an embedded network more than five years ago have saved between 30 and 50 per cent, about 45 per cent on average.

“It’s a really big opportunity, but one that can be thwarted by regulation,” Humphreys said, noting approval took 12 to 18 months even after the required 85 per cent customer consent.

“We need the regulators really to make it easier to get approval,” he said.

Where to start


After handover, Humenergy typically works for the body corporate, maintaining meters and hot water systems so neither the developer nor the committee carries that obligation.

The best first step, Humphreys said, is an energy strategy meeting that sets out what developers want to achieve for the project and their brand.

“The energy decisions made before a building breaks ground stay with it for decades,” he said.

“Bring us in early and we can set it up the right way, for the developer and for every person who will one day call it home. That’s what People Powering People means to us.”



The Urban Developer
is proud to partner with Humenergy to deliver this article to you. In doing so, we can continue to publish our daily news, information, insights and opinion to you, our valued readers.